Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
Foreign-gambling-platform-service@forosharrypotter.com
皇冠体育
Sports-betting-platform-billing@boogiebususa.com
衡水二中
华声娱乐频道
Gaming-platform-hr@netplanna.com
物产中大集团
Betting-recommendation-admin@deestudioproductions.com
Football-betting-media@freeurdupoetry.com
赌博平台
新东方在线资讯中心
IDG资本
汽车站
晋城百姓网
银票网
长天思源
自考365论坛
Longchamp中国
镇江人才在线
烟草客
峰峰信息港综艺频道